Skip to form

City of Richland Energy Services

EnergyServices@ci.Richland.wa.us

625 Swift Blvd. MS-21
Richland, WA 99352

(509) 942-7431

SeamlessDocs

Welcome EV Charger Customer,

The Electric Vehicle Charger Qualified Products List is linked here for your convenience.

For this application to proceed to the Energy Efficiency Staff for review, please complete this incentive application and upload the required documentation below:

  • Photo of the installed EV Charger
  • Photo of Charging Schedule
  • Equipment or Contractor Invoice showing:
    • Invoice Date
    • Installation Cost
    • Model No.
    • Charger Type
    • Quantity of Chargers being installed
    • L&I Permit and passed inspection report
Once the application is reviewed, an email notification stating either “Approval” or “Declined” will be sent to the Customer’s Email on the application.

If approved, please allow up to six (6) weeks for the incentive to process. Thank you.

Please check that you agree before continuing.
By continuing I agree that I am willing to complete a digital version of the document(s) and that information about my user session will be stored.
Signature HereClick to Sign
11/15/2024Click to Sign
Signature HereEnergy Efficiency Staff Will Sign Here
11/15/2024

Create Your Signature

Please fill in your name and email and then either draw or type your signature below.

x

Signature Type

Type Draw Upload Custom
Clear Signature

Signature will be applied to the page. You will have a chance to review after signing.

x

Additional Signatures Required

Photo of the Installed EV Charger Click Here to Upload
Photo of Charging Schedule Click Here to Upload
Equipment/Contractor Invoice showing Invoice Date, Installation Cost, Model No., Type, and Quantity Click Here to Upload
L&I Permit and "Passed" Inspection Report Click Here to Upload
Qualified Product List Page showing Level 2 Smart Charger Model No. Click Here to Upload