Skip to form

City of Richland Energy Services

richlandsolar@ci.richland.wa.us

625 Swift Boulevard, MS-23

509-942-7403

SeamlessDocs

Authorized Agent,

The Renewable Energy Electric Generating System Application Instructions are linked here for your convenience.

NEW REQUIREMENT: The City of Richland now requires the Net Metering Application Fee be paid prior to submitting the application. The Paid Invoice Summary document, which references the solar installation address, is now a required attachment to each Application.

APPLICATION WORKFLOW: For this application to proceed to the Electrical Engineer for review, the Property Owner's email address is required. Following your signature and final submission, a prompt to enter the Property Owner's name and email address will appear. The Property Owner will receive an email notification to sign page 2 of this application. If the email is incorrect, the property owner will not know they need to sign the application to keep it moving in the workflow, and the City Engineer will not receive a notification to review. This application will not move forward without the Property Owner's signature and correct email.

Incorrect emails seems to be a common reason applications are not processing in a timely manner.
Please allow 10-14 working days before you receive a notice to proceed.

CHECK STATUS: You will be able to view the status of the application by logging in to your user account after the application has been submitted.

Thank you.
Please check that you agree before continuing.
I have read and understand the Renewable Energy Electric Generating System Application Instructions.

By continuing I agree that I am willing to complete a digital version of the document(s) and that information about my user session will be stored.
Signature HereClick to Sign
04/25/2025Click to Sign
Your Name HereClick to Sign
Signature HereProperty Owner Will Sign Here
04/25/2025
Your Name Here
Signature HereEngineering Review Will Sign Here
04/25/2025
Signature HereRichland Solar Will Sign Here
Engineering Review

Create Your Signature

Please fill in your name and email and then either draw or type your signature below.

x

Signature Type

Type Draw Upload Custom
Clear Signature

Signature will be applied to the page. You will have a chance to review after signing.

Check this box to continue

x

Additional Signatures Required

Racking system cut sheets Click Here to Upload
One-Line Interconnection Diagram Click Here to Upload
Site Plan-Locations for the meter, solar panels, and house. Click Here to Upload
Paid Invoice Summary Receipt - This is the receipt from Richland Permit Office you receive when you pay your Net Meter Application Fee. Call 509.942.7794 - Option 1 to pay your fee BEFORE you submit this application. Click Here to Upload